– 19 –
@5
1
2
1
@9
@8
@6
@7
12) Open the control box. Connect solenod valve cord
@5
to the CN 106 connectors (red: 19-pn, black:
20-pn).
* Carefully check the wrng locaton of the red and black connectors.
13) Install rght cover
2
and secure wth screws
1
.
14) Ft materal presser rubber cushon
@7
on clamp
@6
. (Ft the cushon to the sde whch has a
shorter dstance from the bent secton to the
end face.)
15) Insert clamp
@6
nto clamp block
@8
and secure
wth two setscrews
@9
. At ths tme, adjust so
that setscrews
@9
are brought to the locaton of
the slot n the top surface of clamp
@6
.