E. Operation Instruction
Review the operation and maintenance instructions with the customer.
a. Customer names:
1.
2.
3.
Customer signature:
Title:
Form completed by:
Month
Day
Year
Table 1: Small direct fired absorption chiller-heater commissioning data sheet (1/3)
User:
Model:
Contract:
User's tag ID code:
Insulation Resistance
Electric Power Supply
Standard: 5 MΩ or more (with 500 V
megger)
R-Gnd
S-Gnd
T-Gnd
Specification: AC � V / � Hz
Circuit breaker
MΩ
Standard: Within
+/- 10% of spec.
R-S
V
U-Gnd
V-Gnd
W-Gnd
R-T
V
Solution circulation pump
MΩ
S-T
V
R-Gnd
V
Refrigerant pump
MΩ
S-Gnd
V
T-Gnd
V
Thermal Relay Setting
Refrigerant Purity
Temperature Setting
Solution circulation pump
A
Standard: 1.040 (kg/L) or less
Cooling
Specific gravity
Setpoint temp.
°F
Refrigerant pump
A
Turbidity
Start/stop temp.
°F
Differential
°F
Heating (if applicable)
Pump Discharge Pressure
Purge Amount
Setpoint temp.
°F
Solution circulation pump
psig
Standard: 4 cc/min or less
Start/stop temp.
°F
Purge tank
mm Abs Hg
Differential
°F
Refrigerant pump
psig
Absorber
mm Abs Hg
YHAU-CGN/H-CXR(M) Small Direct Fired Absorption Chiller-Heater Checklist
8
Model YHAU-CGN/H-CXR(M)Double Effect Direct Fired Small Absorption Chiller-Heater
98