FORM 160.75-O1 (309)
7
JOHNSON CONTROLS
1
source, usually a cooling tower. The condensed refrig-
erant drains from the condenser into the liquid return
line, where the variable orifice meters the flow of liquid
refrigerant to the evaporator to complete the refrigerant
circuit.
7619A(D)
detail a –
COMPRESSOR PREROTATION VANES
The major components of a chiller are selected to handle
the refrigerant, which would be evaporated at full load
design conditions. However, most systems will be called
upon to deliver full load capacity for only a relatively
small part of the time the unit is in operation.
capacitY control
The major components of a chiller are selected for full
load capacities, therefore capacity must be controlled to
maintain a constant chilled liquid temperature leaving
the evaporator. Prerotation vanes (PRV), located at the
entrance to the compressor impeller, compensate for
variation in load (See Detail A).
The position of these vanes is automatically controlled
through a lever arm attached to an electric motor located
outside the compressor housing. The automatic adjust-
ment of the vane position in effect provides the perfor-
mance of many different compressors to match various
load conditions from full load with vanes wide open to
minimum load with vanes completely closed.
Summary of Contents for York MaxE YK Series
Page 2: ...Page 2 of 2 ...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 135: ...JOHNSON CONTROLS FORM 160 75 O1 309 36 SI metric conversion ...
Page 137: ...JOHNSON CONTROLS FORM 160 75 O1 309 38 NOTES ...
Page 138: ...FORM 160 75 O1 309 39 JOHNSON CONTROLS NOTES ...