ForM 160.75-N1 (309)
25
JohNSoN CoNtroLS
All wiring integral with compressor is left on
it, and all conduit is left on shell. All openings
on compressor, oil separator, and shell are
closed and charged with dry nitrogen (2 to 3
PSIG) (115/122 kPa).
Miscellaneous packaging of control center,
tubing, water temperature controls, wiring,
oil, isolators, solid state starter (option), etc.;
refrigerant charge shipped separately.
Units shipped dismantled MUST be re-
assembled by, or under the supervision
of, a Johnson Controls representative.
(See Form 160.75-N3)
Form 7 – Split Shells – Shipped as three major
assemblies. Unit first factory assembled,
refrigerant piped, wired and leak tested; then
dismantled for shipment. Compressor/motor
assembly removed from shells and skidded.
Evaporator and condenser shells are separated
at tube sheets and are not skidded. Refrigerant
lines between shells are flanged and capped,
requiring no welding.
All wiring integral with compressor is left on
it. All wiring harnesses on shells are removed.
All openings on compressor and shells are
closed and charged with dry nitrogen (2 to 3
PSIG) (115/122 kPa).
Miscellaneous packaging of control center,
tubing, water temperature controls, wiring,
oil isolators, solid state starter (option), etc.;
refrigerant charge shipped separately.
Units shipped dismantled MUST be re-
assembled by, or under the supervision
of, a Johnson Controls representative.
(See Form 160.75-N3)
When more than one chiller is involved, the major
parts of each unit will be marked to prevent mixing of
assemblies. (Piping and Wiring Drawings to be furnished
by Johnson Controls)
insPEction – daMagE – shortagE
The unit shipment should be checked on arrival to see
that all major pieces, boxes and crates are received. Each
unit should be checked on the trailer or rail car when
received, before unloading, for any visible signs of
damage. Any damage or signs of possible damage must
be reported to the transportation company immediately
for their inspection.
JOHNSON CONTROLS WILL NOT bE RESPONSIbLE
FOR ANY DAMAGE IN SHIPMENT OR AT JOb SITE
OR LOSS OF PARTS. (Refer to Shipping Damage
Claims, Form 50.15-NM)
When received at the job site all containers should be
opened and contents checked against the packing list.
Any material shortage should be reported to Johnson
Controls immediately. (Refer to Shipping Damage
Claims, Form 50.15-NM)
chillEr data PlatE
A unit data plate is mounted on the control center
assembly of each unit, giving unit model number; design
working pressure; water passes; refrigerant charge;
serial numbers; and motor power characteristics and
connection diagrams.
Additional information may be found on the motor
data plate. This information should be included when
contacting the factory on any problem relating to the
motor.
rigging (see fig. 18)
The complete standard chiller is shipped without skids.
(When optional skids are used it may be necessary to
remove the skids so riggers skates can be used under the
unit end sheets to reduce overall height.)
Each unit has four (4) lifting holes (two in each end) in
the end sheets which should be used to lift the unit.
Care should be taken at all times during rigging and
handling of the chiller to avoid damage to the unit and
its external connections. Lift only using holes shown
in FIG. 18.
Do
not
lift the unit with slings around
motor/compressor assembly or by
means of eyebolts in the tapped holes
of the compressor motor assembly. Do
not
turn a unit on its side for rigging.
Do
not
rig vertically.
Summary of Contents for York MaxE YK Series
Page 2: ...Page 2 of 2 ...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 135: ...JOHNSON CONTROLS FORM 160 75 O1 309 36 SI metric conversion ...
Page 137: ...JOHNSON CONTROLS FORM 160 75 O1 309 38 NOTES ...
Page 138: ...FORM 160 75 O1 309 39 JOHNSON CONTROLS NOTES ...