SHOP DRAWING REVIEW
2995 Sidco Drive
Nashville, TN 37204
(615) 383-1113
FAX (615) 386-8469
www.ssr-inc.com
SSR #
11120270
REVIEWER:
Rick Wood
DATE:
28Jan2013
PROJECT NAME:
Corning Hospital
SECTION NO.:
23 64 16
Review is for general compliance with
SSR LOG NO.:
the design concept of the project and
EQUIPMENT/MATERIAL DESCRIPTION:
general compliance with the information
chillers
given in the contract documents only.
Any action shown is subject to the
requirements of the plans, specifications,
Due to the volume of information in the submittal
and other contract documents.
listed above, this Submittal Review form lists the
comments of the reviewer.
No Exceptions Taken
The submittals have not been marked.
X Make Corrections Noted
A copy of this review must remain with each copy
Amend & Resubmit
of the submittal.
Rejected
NO.
COMMENTS
Condenser and evaporator shells shall have 150 lb flanged pipe connections, not grooved
pipe connections
Note special requirements for CAPACITY TEST penalty for factory performance testing in
specifications- use ARI standard procedures but note additional requirement in specs
No information on head pressure controller, which is the responsibility of the mfr- see specs
and verify compliance/inclusion of scope
No information on refrigerant pumpout system
– see specs and verify compliance
No information on refrigerant monitor system
– see specs and verify compliance
Summary of Contents for York MaxE YK Series
Page 2: ...Page 2 of 2 ...
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 135: ...JOHNSON CONTROLS FORM 160 75 O1 309 36 SI metric conversion ...
Page 137: ...JOHNSON CONTROLS FORM 160 75 O1 309 38 NOTES ...
Page 138: ...FORM 160 75 O1 309 39 JOHNSON CONTROLS NOTES ...