3. Verify that the AC power connection is in place, is the proper
voltage and phase rotation, and is activated. If the power
requirements are not met, notify the hospital engineering department
immediately so they can correct the problem. The phase rotation
should be CBA, that it is, it should be counterclockwise from
standard ABC phase rotation.
4. Make sure that the "route" from the delivery area to the installation
area is large enough to accommodate the system and is not blocked
by other equipment.
5. At the customer site, verify that the system and all necessary
operating supplies have arrived.
Uncrating the System
The Accessory Installation Kit consists of two boxes. One is on top of
the unit; the other is inside the cassette chute. The side of the crate that
forms the ramp is marked at the bottom of the crate. Be sure the ramp
and ramp supports are securely positioned before moving the system.
Figure 2. Uncrating the System.
Summary of Contents for ASP STERRAD 100S
Page 1: ...STERRAD 100S Sterilizer Installation Guide ...
Page 5: ...STERRAD 100S Installation Guide 5 Chapter 1 Installation Overview ...
Page 14: ......
Page 15: ...STERRAD 100S Installation Guide 15 Chapter 2 For Your Safety ...
Page 20: ......
Page 21: ...STERRAD 100S Installation Guide 21 Chapter 3 Installation ...
Page 23: ...Chapter 3 Installation STERRAD 100S Installation Guide 23 Figure 1 Installation Diagram ...