BATTERY DISCONNECT SWITCH - GAS/DIESEL/AC-ELECTRIC
SECTION 4 - MACHINE OPERATION
3121773
– JLG Lift –
4-25
4.11 LIFTING AND TIE DOWN
Lifting
1.
Determine gross weight of machine, refer to the
serial number tag, or weigh the individual unit to
find out the gross vehicle weight.
2.
Place the booms in the stowed position and prop-
erly aligned. All outriggers are fully retracted and
the tracks are fully widened.
3.
Remove all loose items from the machine.
4.
Properly adjust the rigging to prevent damage to
the machine and so the machine remains level.
5.
Width of slings must not exceed 2.36 in (60 mm),
the width of the chains must not exceed .984 in (25
mm), the diameter of the ropes must not exceed
.984 in (25 mm) in order not to exert a pressure in
an abnormal direction on the outrigger plate.
USE OF ROPES, CHAINS OR SLINGS WITH LENGTH LESS THAN 10 ft (3m)
COULD CAUSE PERMANENT DAMAGE TO MACHINE OUTRIGGERS.
To lift machine, a separate sling must be attached to each
outrigger using the appropriate lifting points as indicated in
Figure 4-6..
Weight of machine is not spread equally over the four out-
riggers (See Figure 4-7.). Minimum required capacity of the