4
5
6
SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
6-16
– JLG Lift –
3121773
Installation of Rubber Track
1.
Ensure all hydraulic cylinder grease have been
removed
2.
Align the track links with the wheel teeth. Position
the other end of the track on the track tensioning
wheel
3.
Slowly rotate the drive wheel in reverse while,
using one steel pipe, pushing the track plate inside
the frame.
4.
Verify the track links have engaged the wheel
teeth in the track tensioning wheel
5.
Adjust track tension (see Loosening/Tightening
track section).
Wear Pad Inspection
Check for distance between wear pads and boom sections.
Distance is to be no more than 1/32nd inch.
Turntable Attach Bolts
Ensure the bolts of the coupling elements (turntable) are
torqued to 183 ft-lb. (248 Nm)
Battery Maintenance and Charging - Diesel/AC-Electric
NOTE:
The battery is a maintenance free battery. Do NOT
attempt to open a maintenance-free sealed battery.
External Battery Charger Use
WHEN AN EXTERNAL BATTERY CHARGER IS TO BE USED, CHARGING HAR-
NESS MUST BE PLUGGED INTO A GROUNDED RECEPTACLE. IF RECEPTACLE IS
NOT GROUNDED AND A MALFUNCTION SHOULD OCCUR, THE MACHINE
COULD CAUSE SERIOUS ELECTRICAL SHOCK.
1.
Open battery cover.
2.
Disconnect the terminal clamps from the battery
poles.
3.
Connect the cables of the charger to the battery
poles. and turn on the battery charger
To