SECTION 3 - MACHINE CONTROLS, INDICATORS AND OPERATION
3-8
– JLG Lift –
3121773
3.
Lower remote control station assembly into the
storage box, ensure the attached flexible cable
slides into the slot also on the right side of the box.
4.
On the left side of the control station secure the
box by turning the handle on the locking tab
clockwise locking the rib of the control station
under the rotating metal tab of the handle assem-
bly.
5.
To remove the control station assembly, reverse
the four steps above.
NOTE:
The Platform/Remote control box may also be used to
operate tracks, outriggers, and track widening (if
equipped) by removing it from the platform storage
box and plugging in at the ground control position. If
outriggers are down, boom function (except jib) can
be operated. The basket must be removed for jib oper-
ation.
To
order
go
to
Discount-Equipment.com