SECTION 4 - MACHINE OPERATION
4-20
– JLG Lift –
3121773
4.
Lift the platform off the mounting posts in an
upward direction. Place platform aside for later
installation.
Platform Installation
1.
Lift the platform and align the platform mounts
with the jib mounting posts and lower until
seated.
2.
Secure the platform to the jib mounting posts with
the aluminum threaded caps. Do not overtighten.
3.
Re-install the platform/remote control box into the
mounting support on the platform.
4.8
BATTERY CHARGING - DIESEL/AC-ELECTRIC
NOTE:
Be sure that the machine is parked in a well ventilated
area free of flames and sparks.
•
Only plug the charger into a properly grounded outlet.
•
Do not use ground adaptors or modify plug. Do not
touch non-insulated portion of output connector or
non-insulated battery terminal.
•
Always disconnect the AC supply before making or
breaking the connections to the battery.
•
Do not open or disassemble charger.
•
Do not operate charger if the AC supply cord is dam-
aged or if the charger has been damaged in any way.
Battery Charging - Daily
BEFORE CONNECTING THE BUILT-IN CHARGER TO THE RECEPTACLE, ENSURE
THE KEY ON THE ENGINE IS POSITIONED TO OFF.
The machine has a built-in battery charger. To activate this
feature connect the machine to an appropriately grounded
AC receptacle and activate the charging switch behind the
clear plastic door.
(See photo)
Verify the battery disconnect
switch is on.
To
order
go
to
Discount-Equipment.com