
Chapter 6
FTTA-SLM Software option
Launching the acquisition
User Manual
770000102/08
83
Launching the acquisition
1
Press
S
TART
/S
TOP
hard key to launch measurement.
The red
Test
indicator goes on to show that the T-BERD/MTS is in
process of acquisition and the screen displays the trace in process
of acquisition.
2
The quality of the connection is displayed
for a few seconds (see
)
3
Then, a bar graph shows elapsed and remaining acquisition time.
At the end of the acquisition, a beep is emitted, the trace is
displayed and an automatic measurement is started.
If the module possesses several lasers, to perform successive acquisi-
tions on all the wavelengths:
Inspect & clean all fiber connections prior connecting fiber
cables into the ports (BBU, distribution boxes, OVP and RRU/
RRH and SFP ports).
Fig. 49
Acquisition in progress
Number of
averages calculated
Elapsed
acquisition time
Total acquisition time
Elapsed time
NOTE
During acquisition, the traffic on fiber is automatically detected (see
“Traffic detection” on page 39
MTS2100 4100 Module US rev08.book Page 83 Jeudi, 1. août 2013 1:43 13