6-5
6.1.4 Installation of the Sensor to Pass a Cable through a Pole
It is possible to pass a cable through a pole, when DGPS sensor attached to poles with cut male
screws. (1 inch-14 UNS-2A). In this case, cable guard rubber (accessory) is used.
(1) The cable is installed as following figure. Do not bend the cable acutely. Doing so may result
in damage to the cable.
Cable installation figure
(2) Push the accessory cable guard rubber all the way in the hole as shown below.
Do not bend it acutely.
Cable guard rubber
(accessory)
Push all the way
in.
Summary of Contents for JLR-7900
Page 2: ......
Page 11: ...ix...
Page 16: ......
Page 23: ...1 7 NBD 577C Power Supply Outline Drawing Unit mm Mass Approximately 5 4 kg...
Page 27: ...1 11 NQA 4351 Output Buffer Outline Drawing Unit mm Mass Approximately 0 8 kg...
Page 29: ...1 13 NCZ 1663 Select Switch Unit mm Mass Approximately 0 2 kg...
Page 30: ...1 14 NCZ 1663 Select Switch Flush Mounting Unit mm Mass Approximately 0 2 kg...
Page 31: ...1 15 NCZ 1537B Select Switch Flush Mounting Unit mm Mass Approximately 0 55 kg...
Page 33: ...1 17 NKG 94 Printer Outline Drawing Unit mm Mass 2 2 kg or less Printer Rack...
Page 38: ...2 4...
Page 42: ...3 4...
Page 138: ...6 10 Required installation space Unit mm Mount bottom 285 or more 190 or more 190 or more...
Page 158: ...6 30...
Page 160: ...7 2...
Page 162: ...8 2...
Page 181: ......
Page 182: ......
Page 183: ......