![background image](http://html1.mh-extra.com/html/jacto/advance-2000-am-18/advance-2000-am-18_operators-manual_3177642032.webp)
2-32
2
A
S
SE
M
B
LY
ADVANCE 2000
Acoplamento
Assembly and adjustment of the conventional power takeoff shaft
NOTE:
Before using the equipment for
the first time, clean and lubri-
ca-te all the PTO shaft points
with grease NLGI-2 lithium ba-
sed as shown in the illustration
be-side (for further informa-
tion on recommended grease,
refer to the lubrication table).
Only operate the power takeoff
shaft fitted with its protection
cover. The chain must be re-
-placed if one or more links are
stretched.
This procedure must be carried
out with the machine stopped
and the engine off. Employees
performing any kind of mainte-
-nance service in the PTO shaft
must wear adequate PPE such
as protective gloves, boosts,
glasses, etc.
• Install the PTO shaft on the IPTO (indepen-
dent power take off) and install the safety
chain. Angular movements should be con-
sidered when assembling the chain.
• Adjust the length by cutting the boom and
the protection proportionally. Be sure to re-
move and clean all burrs.
• Acople o cardã e instale a corrente de se-
gurança. Na montagem da corrente devem
ser considerados os movimentos angulares.
• Shut-off the PTO in excessively closed
maneuvers.
Summary of Contents for Advance 2000 AM-18
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 28: ......
Page 44: ......
Page 46: ......
Page 52: ......
Page 54: ......
Page 72: ......
Page 74: ......
Page 104: ......
Page 108: ......
Page 110: ......
Page 115: ...ADVANCE 6 115 Technician visits record Date No of Hours Problems Technician Retailer...
Page 116: ......
Page 118: ......