• The raising of the equipment to change
the tires or to widen the track requires a
lot of attention.
• Keep the equipment hitched to the tractor
and positioned on a firm and flat surface.
To change the tires, proceed as follows:
• With the aid of a hydraulic jack (lifting
capacity greater than 2000 kg for each
point “B”), lift the equipment at the spots
as marked by the sticker “A”.
• In preference, these operations must be
made with the machine’s tank empty and
with the booms in their closed position.
In relation to the changing of the tires:
• Do not remove the object that caused
the puncture whilst the tire is full of air.
Deflate it first.
• If, whilst removing the tire, it gets out of
control and is threatening to fall, release
it and do NOT try to hold it.
• The disassembly services of the tires
must be carried out by experienced pro-
fessionals. Whilst inflating the tire remain
alert as to its pressure. Never exceed the
pressure as recommended by the manu-
facturer. The bursting of a tire may cause
serious accidents.
• If the need arises to repair the wheel /
rim, remove the tire. Welding repairs
causes heating of the metallic parts and
damages to the tires.
Changing the tires
B
B
A
Summary of Contents for Advance 2000 AM-18
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 28: ......
Page 44: ......
Page 46: ......
Page 52: ......
Page 54: ......
Page 72: ......
Page 74: ......
Page 104: ......
Page 108: ......
Page 110: ......
Page 115: ...ADVANCE 6 115 Technician visits record Date No of Hours Problems Technician Retailer...
Page 116: ......
Page 118: ......