This section describes pump operation and programming. Run the pump
after pipework and wiring is completed.
Before operation
First check piping and wiring are correct. And then make commissioning before starting op-
eration.
Points to be checked
Before operation, check if...
• Liquid level in a supply tank is enough.
• Piping is securely connected and is free from leakage and clogging.
• Discharge/suction valves are opened.
• Power voltage range is correct.
• Electrical wiring is correct and is free from the risk of short circuit and electrical leakage.
Retightening of pump head fixing bolts
Important
The pump head
fi
xing bolts may loosen when plastic parts creep due to temperature change in storage or in
transit, and this can lead to leakage. Be sure to retighten the bolts evenly to the speci
fi
ed tightening torque
below in diagonal order before starting operation.
Tightening torque
Model code
Torque
Bolts
Number of bolts
IX-C150
12 N•m
M8 hexagon head bolt
8
IX-C060
3.5 N•m
M5 hexagon head bolt
6
*Tighten
fi
xing bolts once every three months.