33
O
pe
ra
tion
Before operation
Rotate the adjusting screw two revolutions anticlockwise
to open the air vent port.
NOTE
Do not rotate the screw three revolutions. The adjusting screw
may come off with solution spray.
Push the start/stop key and run the pump for more than
ten minutes for degassing.
The ON LED blinks at each shot.
Push the start/stop key and stop the pump.
Rotate the adjusting screw clockwise to close the air vent port.
Check liquid is delivered to the discharge line.
Degassing must be repeated until liquid is outputted from the pump outlet.
Check connections for leakage.
Degassing has now been completed.
3
4
5
6
7
8
Adjusting screw
Summary of Contents for EHN-B11-NAE
Page 67: ...67 Specifications ...