22
Installation
This section describes the installation of the pump, piping and wiring.
Read through this section before work.
Points to be observed
Observe the following points when installing the pump.
•
Be sure to turn off power to stop the pump and related devices before service is per-
formed.
•
If you notice any abnormal or dangerous conditions, suspend operation immediately and
inspect/solve problems.
• Do not place explosive or flammable material near the pump.
• Use of a damaged pump could lead to an electric shock or death.
Pump mounting
Select an installation location and mount the pump.
Necessary tools
• Four M5 bolts (pump mounting)
• An adjustable wrench or spanner
Select a suitable place.
Select a level location, free from vibration, that won't hold liquid. See page 10 for detail. Flooded suc-
tion installation is strongly recommended when handling liquids that generate gas bubbles (sodium
hypochlorite or hydrazine solution).
Anchor the pump by four M5 bolts.
Be sure to fix the pump at four points.
NOTE
Install the pump horizontally. If the pump is installed at a tilt, the flow may reduce.
1
2
Pump mounting
Summary of Contents for EHN-B11-NAE
Page 67: ...67 Specifications ...