4
2. Procedures from installation to operation
Some errors have been found
Have the problems been solved?
Prepare the 24V DC power supply, such as DC power supply
units.
Prepare a PC, and install necessary applications.
Open the package, and check the model, specifications, and
voltage, etc.
Check accessories.
Advanced preparation
Start using only after you have understood all the product’s functions,
safety information, and precautions.
Read this manual
Product check
Perform maintenance and inspection
based on corresponding parts.
Yes
Maintenance/Inspection
Take appropriate measures based
on the corresponding symptoms.
Troubleshooting
Use the designated application, and perform property
settings.
Control
Perform start-up inspection.
Start-up inspection
Run operation.
Install the MABS (this product) main unit.
Installation
Mount the controller.
Connect the MABS (this product) main unit and controller.
Connect power and signal cables to the controller.
Perform settings of the controller.
Connect to power supply units.
Wiring