CAUTION
CAUTION
CAUTION
3-2.
Precautions on
installation
3. Safety precautions
Precautions on wiring
Take appropriate measures to prevent totes from popping out of
the equipment.
For example, mount guide rails on the conveyor frames.
Failure to follow this could result in workers getting injured by totes popping out of
the equipment.
If necessary warning/caution labels become hidden after
installation, affix again on places where they can be seen.
When attaching or removing connectors, turn off the power first,
securely hold connectors, and perform operation.
Do not apply excessive force to the controller connection parts,
such as obliquely attaching or removing connectors.
Failure to follow this could result in electric shock, malfunction, and/or accidents
due to unexpected operation.
Perform wiring to connectors so that cables make secure contact
with connectors.
Barb lines from the cable core could result in heat generation and/or fire due to
changes of contact resistance, and/or short circuit with the adjacent contact.
3-3.
Precautions on wiring
Do not forcibly bend and/or pull cables.
Do not put heavy materials on cables, or do not get them stuck
between cables.
Failure to follow this could result in fire and/or electric shock due to cable
damage.
Wear protective equipment, such as gloves.
Do not unplug power and/or signal cables during operation.
Do not run/stop this product using the power supply.
Failure to follow this could result in malfunction.
In the event that any abnormalities occur, for example, if abnormal
noise is heard from the product, the temperature becomes high, or
electric leakage occurs, turn off the power immediately.
Failure to follow this could result in unexpected injury.
Do not forcibly move totes when they are placed on transfer balls.
Failure to follow this could result in damage and/or malfunction.
Make sure to perform the start-up inspection before starting
operation.
3-4.
Precautions related to
operation
Safety precautions
Advanced preparation
Product check
Structures
Installation/Wiring
Control/Operation
Maintenance/Inspection
Troubleshooting
Appendix
IB-E06F-M1 settings
Original notice - U1.1