Rack Requirements
•
Racks should measure a minimum of 19” wide and 35.5” (0.9m) deep.
•
Racks should be ventilated
•
Racks should be grounded
•
Racks should enable a Technician access to front and rear of the ioiboxes
•
ioiboxes should be supported by fixed ventilated shelf or server rails
•
ioiboxes shouldn’t rest on Video Patch Panels.
•
ioiboxes should be mounted to the front of the rack with four server-mounting screws.
Connecting the ioibox Unit
This section contains explanations and procedures for connecting the ioiboxes. Note that the power
connection is recommended to be the last step of the first phase of hardware installation.
This section contains the following:
•
(page 32)
•
(page 34)
•
(page 34)
•
•
(page 40)
•
Connecting ioimage unit Video Output to a Analog Device
(page 46)
•
Connecting the External Protective Earth Terminal
•
(page 46)
Connecting to the Network
Before connecting the ioibox unit to the network assure that the LAN/WAN supports the ioibox unit
Block IPs and will allow the each Block to communicate with remote workstations where the
ioimage-Monitor or ioimage HTML Edition Setup are used.
By default, ioiboxes are shipped with a factory set Block IPs and MAC addresses labeled on the
ioibox unit package and the automatic network IP configuration mode supporting DHCP
connectivity is disabled.
This means if the ioibox unit is connected to a DHCP network, the static IPs labeled on the ioibox
unit package will not be used.
32