28
INSTALLATION AND ASSEMBLY
sMove controller
•
Installation and operating manual
►
Lay the fan-BUS cables in pairs into the
flush-mounted box.
►
Remove about 8.5 mm of insulation from each
fan-BUS cable.
►
Fill the space between the interior wall and the box
with a suitable filler.
►
Connect the fan-BUS cables to terminal blocks,
5-pole, as follows:
The cable ends
• of the same colour
• of ventilation units in paired operation
should be connected to the same pole of the
terminal block
Ö
A maximum of 4 poles are assigned with
2 cables each.
►
Attach the cable ends of the additional connecting
cable, 3-wire, to the terminal block of the corre-
sponding colour.
►
Push the connected terminal blocks into the box.
Ö
The distribution box is fit.