sMove s8 controller: Installation with flush-mounted switching PSU
When mounting the sMove s8 with flush-mounted switching power supply, 2 wall boxes are
required. The fan cables are laid into one of the flush-mounted boxes which acts as a distribu
-
tor. The cover of the flush-mounted box for distribution must be provided by the customer. We
recommend the cover in the switch design used.
The flush-mounted power supply unit is mounted in a second box. The operating unit is connec
-
ted and mounted on the flush-mounted box for the switching power supply unit.
To connect the fans, a 3-wire connecting cable is laid between the two boxes.
Fitting the fan-BUS distribution box
Filler for installing the box, stripping tool, terminal blocks, 5-pole (3 x), cover for the box
(e.g. cover in switch design)
Requirements:
The wall openings are created.
The fan cables and the fan connecting cable are laid.
►
Break out one cable entry
• per fan pair
• for the fan connecting cable
in the flush-mounted box.
►
Insert the flush-mounted box into the wall opening.
►
Connect the
PSU's input cable
(blue/brown) via
the lustre terminal:
• Connect the phase conductor with
cable L(brown).
• Connect the neutral conductor with
cable N (blue).
►
Slide the connected PSU into the box.
Ensure that
the cable end protrudes into the
interior space.
Ö
The flush-mounted switching PSU is connected.
Proceed with installation of the operating unit (see section 5.7: Installing the operating unit)