30
INSTALLATION AND ASSEMBLY
sMove controller
•
Installation and operating manual
5.7
Installing the operating unit
The operating unit is mounted onto the installed flush-mounted or cavity wall box for the ope
-
rating unit. The fan cables for the versions with cabinet power supply unit and for the sMove s4
with flush-mounted power supply unit are located inside the box and distributed in it.
To connect an optional sensor, e.g. CO
2
sensor or to a home automation system, follow the
instructions in grey italics.
Stripping tool, fan-BUS connection cable, 3-wire, terminal blocks, 5-pole (3 x)
Requirements:
The mounting box is fitted.
The switching PSU is connected.
►
Pull the lever on the lower right side of the operat-
ing unit backwards (1).
►
Slide the base plate downwards as far as the stop
(2).
Ö
The operating unit is unlocked.
►
Screw the operating unit base plate to the box
using fixing screws.
Ensure that
the arrow above the word TOP is
pointing upwards.
►
Remove the base plate from the operating
unit (3).
Ö
The base plate has been removed from the
operating unit.
1
2
3
1
2
3