6
Commissioning
6.2
Commissioning
the energy meter
INTILION scalebloc 0.5C
85
Open the page for the entry of the transformer ratio:
Illustration 48: Configuration software UCS
– entering the transformer ratio
The transformer ratio can be adjusted under C
URRENT
T
RANSFORMER
R
ATIO
in the
Settings section of the Electrical System tab.
•
Check the ratio on the transformer.
•
If the transformer has a ratio of 400/5 A, for example, then 400 A should be entered
under Primary and 5 A under Secondary. This gives a transformer ratio of 80.
•
No changes should be made under V
OLTAGE
T
RANSFORMER
R
ATIO
. However, check to
make sure that the ratio is set to 1.0.
Then open the page containing the network settings for the energy mete:
Illustration 49: Configuration software UCS -- network settings for the energy meter
Summary of Contents for scalebloc 0.5C
Page 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Page 34: ......
Page 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Page 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Page 78: ......
Page 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Page 100: ......
Page 102: ...8 Fault 100 INTILION GmbH ...