10
Decommissioning
and disassembly
10.2
Disassembly
INTILION scalebloc 0.5C
115
10.2.2.9 Preparing the battery storage system for loading
•
Remove the fastenings securing the battery storage system onto the foundation.
•
Follow these steps in reverse order to secure the floor plates.
•
Insert the side panels and push them backwards to the back of the battery storage
system.
•
Secure the side panels using the previously removed screws.
Illustration 69: Securing the front panel
•
Insert the front panel and push it as far as it will go (approx. 10 mm) in the direction of
the arrow.
•
Secure the front panel using the previously removed screws (1).
•
Close the doors of the battery storage system.
To this end, start by lifting up the respective latching hook.
Summary of Contents for scalebloc 0.5C
Page 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Page 34: ......
Page 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Page 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Page 78: ......
Page 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Page 100: ......
Page 102: ...8 Fault 100 INTILION GmbH ...