9
Maintenance
9.2
Inspection
and maintenance work
INTILION scalebloc 0.5C
105
9.2.3.4
AC unit
•
Maintain the AC unit in accordance with the specifications from INTILION GmbH.
Information on maintenance work to be performed on the AC unit can be found in the
documentation from INTILION GmbH.
9.2.3.5
Smoke detector
•
Maintain the smoke detector in accordance with the supplier's specifications.
Information on maintenance work to be performed can be found in the supplier’s
documentation.
9.2.3.6
Doors
•
Check the sealing elements on the doors for wear.
•
Replace any worn sealing elements.
9.2.4
Special maintenance intervals
9.2.4.1
AC unit
•
Clean the AC unit air filter at least every 3 months.
Information on maintenance work to be performed on the AC unit can be found in the
documentation from INTILION GmbH.
9.2.4.2
Electrical equipment
DANGER
Risk to life due to electric shock!
Live components can cause fatal electric shock if touched.
–
Work on the electrical equipment must only be performed by a
specialised electrician with WLE certification.
•
Perform the preparatory measures (see “9.2.2 Preparatory measures”).
Carry out thee safety check in accordance with the country-specific standards and
guidelines.
Summary of Contents for scalebloc 0.5C
Page 33: ...2 Safety 2 10 Obligations of the system manager INTILION scalebloc 0 5C 31 ...
Page 34: ......
Page 46: ...4 Transport and storage 3 3 Technical specifications 44 INTILION GmbH ...
Page 77: ...5 Installation 5 12 Establishing the mains connection INTILION scalebloc 0 5C 75 ...
Page 78: ......
Page 98: ...6 Commissioning 6 8 Contacting the Hoppecke Service team 96 INTILION GmbH ...
Page 100: ......
Page 102: ...8 Fault 100 INTILION GmbH ...