Displaying and Saving Events
156
Interphase Corporation
N
OTE
If you want to test more than two B channels or more than
one port simultaneously, launch several instances of the
utility and repeat Steps
and
for each channel or port.
(You can change the number of frames sent if you want a
longer test. See
Specifying the Number of Frames to Send
5.
After you have finished testing the ISDN line, re-enable
the RAS Server and the Acotec Virtual Motion RAS
Port Manager as follows:
a.
From the
Start
menu, select
Settings
, and then
Control Panel
. Then double-click the
Services
icon
to display the Services dialog box.
b.
Select
Remote Access Server
from the list of
services, and click
Start
.
c.
Select
Virtual Motion RAS Port Manager
from
the list of services, and click
Start
.
d.
Click
Close
.
Displaying and Saving Events
The event list is an additional window at the bottom of the
LoopTest main dialog that displays communication events,
such as communication established between the two B
channels, and data being sent on one B channel.
Summary of Contents for ENTIA 5536 DM PRI
Page 34: ...Minimum System Requirements 14 Interphase Corporation...
Page 46: ...Connecting to an MVIP Bus 26 Interphase Corporation...
Page 56: ...Connecting to the Network 36 Interphase Corporation...
Page 90: ...Removing the Drivers 70 Interphase Corporation...
Page 136: ...Verifying COM Ports 116 Interphase Corporation...
Page 172: ...Saving and Editing Frames 152 Interphase Corporation...
Page 182: ...Understanding LoopTest Messages 162 Interphase Corporation...
Page 190: ...Setting Port and Clock Modes 170 Interphase Corporation...
Page 196: ...Interpreting Line Status Indicators 176 Interphase Corporation...
Page 208: ...Procedures 188 Interphase Corporation...
Page 220: ...Europe 200 Interphase Corporation...