![Interphase ENTIA 5536 DM PRI User Manual Download Page 177](http://html1.mh-extra.com/html/interphase/entia-5536-dm-pri/entia-5536-dm-pri_user-manual_2080094177.webp)
Appendix C: LoopTest Utility
5536 PRI RAS Communications Controller Users Guide
157
To show or hide the LoopTest event list, on the LoopTest main
dialog box, select
Display event list
from the
Test
menu.
To save the event list to an ASCII (text) file, select
Save
or
Save as
(to save a previously saved file with a different name)
from the
Test
menu.
Specifying the Number of Frames to Send
To specify the number of frames to send, do the following:
1.
On the LoopTest main dialog box, select the
Parameters
option from the
Test
menu.
The Test Parameters dialog box appears:
Figure C-2. LoopTest Parameters
2.
Enter the number of frames in the
Iterations count
field. The higher the iterations count, the longer the test
duration.
(The sub-address is not used for 5536-DM testing.)
Summary of Contents for ENTIA 5536 DM PRI
Page 34: ...Minimum System Requirements 14 Interphase Corporation...
Page 46: ...Connecting to an MVIP Bus 26 Interphase Corporation...
Page 56: ...Connecting to the Network 36 Interphase Corporation...
Page 90: ...Removing the Drivers 70 Interphase Corporation...
Page 136: ...Verifying COM Ports 116 Interphase Corporation...
Page 172: ...Saving and Editing Frames 152 Interphase Corporation...
Page 182: ...Understanding LoopTest Messages 162 Interphase Corporation...
Page 190: ...Setting Port and Clock Modes 170 Interphase Corporation...
Page 196: ...Interpreting Line Status Indicators 176 Interphase Corporation...
Page 208: ...Procedures 188 Interphase Corporation...
Page 220: ...Europe 200 Interphase Corporation...