![Interphase ENTIA 5536 DM PRI User Manual Download Page 175](http://html1.mh-extra.com/html/interphase/entia-5536-dm-pri/entia-5536-dm-pri_user-manual_2080094175.webp)
Appendix C: LoopTest Utility
5536 PRI RAS Communications Controller Users Guide
155
The LoopTest main dialog box appears:
Figure C-1. LoopTest Main Dialog Box
3.
Select the port to test from the drop-down list (if
needed), and enter your local ISDN number in the
Local
number
field.
4.
Click
Test
.
The
Diagnostic
field describes the test result. If the
message
Test Passed
appears, your ISDN line is
working, and RAS dial-in or dial-out can be done.
If an error occurred, LoopTest displays information
about the cause and circumstances of the error. For
more detailed information about these messages, see
Understanding LoopTest Messages
If you want to view additional information about
communication events, select
Display event list
from
the
Test
menu.
Summary of Contents for ENTIA 5536 DM PRI
Page 34: ...Minimum System Requirements 14 Interphase Corporation...
Page 46: ...Connecting to an MVIP Bus 26 Interphase Corporation...
Page 56: ...Connecting to the Network 36 Interphase Corporation...
Page 90: ...Removing the Drivers 70 Interphase Corporation...
Page 136: ...Verifying COM Ports 116 Interphase Corporation...
Page 172: ...Saving and Editing Frames 152 Interphase Corporation...
Page 182: ...Understanding LoopTest Messages 162 Interphase Corporation...
Page 190: ...Setting Port and Clock Modes 170 Interphase Corporation...
Page 196: ...Interpreting Line Status Indicators 176 Interphase Corporation...
Page 208: ...Procedures 188 Interphase Corporation...
Page 220: ...Europe 200 Interphase Corporation...