![Imagine Panacea Lite Operation Manual Download Page 49](http://html1.mh-extra.com/html/imagine/panacea-lite/panacea-lite_operation-manual_2045417049.webp)
Chapter 4
P12×1-SP Installation, Configuration, and Operation
30
Copyright © 2004-2007, 2008, 2010, Harris Corporation
Installing a
P12×1-SP
Submodule
If your Panacea Lite frame already has a P12×1-SP submodule installed, skip
this section and go directly to
Configuring a P12×1-SP Submodule
on page
33.
If you are upgrading an existing Panacea Lite to include the P12×1-SP
submodule, follow these installation instructions to install the submodule into
the frame.
Preparing the
Frame
1
Unplug the Panacea Lite frame so that it does not receive electrical power.
2
Remove the frame from its rack location and set the frame onto a flat surface.
3
Unscrew the screws on the top of the Panacea Lite frame, then remove the
frame top from the frame body. Set these screws aside, as you will need them
later.
Mounting the
P12×1-SP Module
1
Locate the P12×1-SP mounting holes on the inside of the frame.
Figure 4-1
P12×1-SP Mounting Holes
2
Mount the P12×1-SP to the frame, using the screws provided. (It may be easier
to do this if you turn the router on its side.)
If the extenders on the P12×1-SP do not line up exactly with the mounting
holes in the frame, you may want to slightly loosen the screws holding the
extenders onto the P12×1-SP. This will allow you to move the extenders
enough to line up with the mounting holes.