OPERATION
9VXE ENG
2-14
RUNNING IN NEW MACHINE
If a new machine is used by force, the
performances may be deteriorated earlier and the
service life may be shortened. Run in the machine
for the initial 50 hours.
Follow the instructions below and run in the new
machine.
1. Warm up the machine sufficiently.
2. Do not run the machine with heavy loads or at high
speed.
Run the machine at about 80% of the maximum engine
revolution.
3. Do not apply the full load to the machine. The
adequate load is 80% or so. Do not run the machine by
force.
4. Do not start, accelerate or stop the machine quickly or
change the direction quickly.
5. Do not apply shocks such as quick stopping of the
boom when lowering it to the machine.
6. Grease the pins of the attachment everyday.
WC-C200460
WC-C200470
WC-C200430
Warming up
Summary of Contents for 9VXE
Page 2: ......
Page 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Page 10: ...9VXE EN ...
Page 28: ...9VXE EN ...
Page 66: ...OPERATION 9VXE ENG 2 38 ...
Page 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Page 69: ...9VXE EN ...
Page 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Page 102: ...MAINTENANCE 9VXE EN 3 33 ...
Page 108: ...9VXE EN SPECIFICATIONS ...
Page 109: ...9VXE EN ...
Page 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Page 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Page 117: ......
Page 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...