OPERATION
9VXE ENG
2-15
LEVER OPERATIONS
Operation Mode
Three operation patterns are available. The handling methods of the operation levers and
machine movements differ with these patterns.
Check the operation mode before using the levers. The operation mode plate is stuck on the right
of the operator's seat.
WB-C210270
Operation mode
Operation
direction
Pattern A
Pattern B
Pattern F
1
Boom raise
Boom raise
Arm in
2
Boom lower
Boom lower
Arm out
3
Bucket dig
Bucket dig
Bucket dig
4
Bucket dump
Bucket dump
Bucket dump
5
Arm in
Swing left
Boom raise
6
Arm out
Swing right
Boom lower
7
Swing left
Arm out
Swing left
8
Swing right
Arm in
Swing right
Check the action of each operation lever and movement of the machine before starting
work in order to prevent accidents, which may result in injury or death, due to improper
operations.
Bucket
dump
Arm out
Arm in
Bucket dig
Boom lower
Boom
raise
Swing right
Swing left
Operation
mode plate
Summary of Contents for 9VXE
Page 2: ......
Page 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Page 10: ...9VXE EN ...
Page 28: ...9VXE EN ...
Page 66: ...OPERATION 9VXE ENG 2 38 ...
Page 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Page 69: ...9VXE EN ...
Page 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Page 102: ...MAINTENANCE 9VXE EN 3 33 ...
Page 108: ...9VXE EN SPECIFICATIONS ...
Page 109: ...9VXE EN ...
Page 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Page 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Page 117: ......
Page 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...