OPERATION
9VXE ENG
2-17
Pattern AB changing method
1. It is necessary to re-assemble the reach rods of the left operation lever, if the pattern A
operation system (standard operation system) is changed into the pattern B. Open the cover
on the front of the lever stand and re-assemble the reach rods.
2. The operation system changing plate is stuck on the inside of the lever stand front cover.
3. Lower the attachment onto the ground and stop the engine before re-assembling the reach
rods.
D40538200
WB-C210280
Pattern A positions
Pattern B positions
Pattern A
Pattern B
Operation system changing plate
Pattern A positions
Pattern B positions
Operation system changing plate
Summary of Contents for 9VXE
Page 2: ......
Page 8: ...FOREWORD 9VXE EN 0 4 This page is intentionally left blank ...
Page 10: ...9VXE EN ...
Page 28: ...9VXE EN ...
Page 66: ...OPERATION 9VXE ENG 2 38 ...
Page 67: ...OPERATION 9VXE ENG 2 39 This page is intentionally left blank ...
Page 69: ...9VXE EN ...
Page 101: ...MAINTENANCE 9VXE EN 3 32 ELECTRIC SYSTEM DIAGRAM ...
Page 102: ...MAINTENANCE 9VXE EN 3 33 ...
Page 108: ...9VXE EN SPECIFICATIONS ...
Page 109: ...9VXE EN ...
Page 115: ...SPECIFICATIONS 9VXE EN 4 6 This page is intentionally left blank ...
Page 116: ...MINI EXCAVATOR 9VXE PUBLISHED JUNE 2012 IHIMER S p A ITALY ...
Page 117: ......
Page 118: ...IHIMER Spa 53037 San Gimignano Loc Cusona SI Italy info ihimer com www ihimer com ...