50 / 136
00RNO0333-B (U0625869)
EVO S -
Installation and Servicing
Diagram: VF2
page 3 / 6
Boiler pump supplied by the customer (all-or-nothing control):
}
Module 1
QX21
N
QX22
N
QX23
N
L
}
Boiler pump Q1
AGU 2.550
on
IMPORTANT:
configure the switches on the AGU 2.550 extension modules.
E. SPECIFIC START-UP PROCEDURE
"
"
Make the accessories' electrical connections.
"
"
Start up the boiler only.
"
"
Carry out the adjustments below.
Line No. Value
• Time and date
menu
Set the time
Hours / minutes
(1)
HH.MM
Set the date
Day / month
(2)
DD.MM
Set the year
Year
(3)
YYYY
• Configuration
menu
Start up heating circuit 1
Heating circuit 1
(5710)
On
Configure the alarm output
Relay output QX
1
(5890)
Alarm output K10
Configure DHW pump Q3
Relay output QX
2
(5891)
DHW ctrl elem Q3
Configure the direct circuit pump Q2
Relay output QX3
(5892)
Heat circuit pump
HC1 Q2
Boiler pump supplied by IDEAL:
No adjustments necessary