27.08.2018
61 / 136
EVO S -
Installation and Servicing
Single boiler
4 regulated circuits, with DHW production
Diagram
VF4
page 1 / 8
A. HYDRAULIC DIAGRAM
figure 25 -
VF4 diagram
The water law of the heating circuit is programmed on the NAVISTEM B3000 with a weekly heating
programme.
The AGU 2.550 interfaces built into the boiler are used to control the two three-way regulating valves of
the heating networks. The two others will be managed by the RVS 63 integrated into an outside case at
the boiler.
The boiler operates in variable flow temperature according to the outdoor temperature measured by the
exterior sensor QAC 34, without a low temperature limit.
The production of domestic hot water is controlled by the NAVISTEM B3000 using the QAZ 36 sensor in
the tank.
B. REGULATION ACCESSORY REQUIRED
Quantity
Appliance reference
Order No.
Heating circuit regulation kit
1
RVS 63
219482
Extension module kit (delivered with a
network sensor QAD 36)
2
AGU 2.550
219483
Communication kit for LPB bus
1
OCI 345
219285
DHW sensor kit
1
QAZ 36
219481
Output sensor kit
1
QAC 34
219479