![ICETEAM 1927 SL193-011342 Electronic Manual Download Page 53](http://html1.mh-extra.com/html/iceteam-1927/sl193-011342/sl193-011342_electronic-manual_3397416053.webp)
SL193-011342 ED00 10-2018
50
Sensor calibration after electronic board
replacement
If control unit is replaced, this procedure allows copying TEV, TEC, TGV(T.CN) and TGC(T.RC)
probe settings from the old control unit to the new one.
(Check if, with the control unit to be replaced duly powered, display can still be read).
In this case ONLY, you can carry out the following probe calibration procedure. Set the
machine to STOP mode and:
1)
Press PRODUCTION and RESET at the same time and keep them pressed for 10".
2)
Release buttons as soon as display shows "
Probe Setup
".
3)
Now the display shows TEV probe numerical values for 30". For ex.:
NOTE:
The first 3 values (TVQ-TVM-PZV) to program them in the new board.
Each value flashes for 10", then set probe TEV.
4)
The display shows TEC probe numerical values for 30". For ex.:
NOTE:
The first 3 values (TC1-TM1-PZ1) to program them in the new board.
14:03:00 Mon
Probes Setup
TVQ TVM PZV TEV
557 408 +05 +001
TC1 TM1 PZ1 TEC1
553 406 +05 +001
Summary of Contents for SL193-011342
Page 1: ...Electronic Manual English Version Ed00 10 2018 SL193 011342 P1...
Page 2: ......
Page 6: ...XIX C Ohm table 48 XX Sensor calibration after electronic board replacement 50...
Page 12: ...SL193 011342 ED00 10 2018 9 Figure 3 PR Left Side PR EVRC TEC EVRC TEV EVRC Figure 4 5 TEC TEV...
Page 58: ......