2. ____ Install the captive nuts on the rack for installing the NAS and the display.
See Figure 1-9 for the front and rear rack location, and Figure 1-11 on page 1-9
for installation.
28
25
25
Figure 1-9. Brackets and Captive Nuts Positioning for the NAS with Earthquake Feature
1
2
Figure 1-10. Brackets Installation
Installing the NAS and Its Modem
1-8
2220 Setup and Service Guide
Summary of Contents for xSeries 300
Page 2: ......
Page 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Page 10: ...viii 2220 Setup and Service Guide ...
Page 14: ...xii 2220 Setup and Service Guide ...
Page 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Page 82: ...4 16 2220 Setup and Service Guide ...
Page 142: ...B 10 2220 Setup and Service Guide ...
Page 144: ...C 2 2220 Setup and Service Guide ...
Page 146: ...D 2 2220 Setup and Service Guide ...
Page 156: ...E 10 2220 Setup and Service Guide ...
Page 159: ......