background image

 

 

 

 

 

 

MyPower S2300-28TC-AC Switch 

Installation  Manual

 

 

 

 

 

 

 

 

Maipu Communication Technology Co., Ltd 

No. 16, Jiuxing Avenue 

Hi-tech Park 

Chengdu, Sichuan Province 

People's Republic of China - 610041 

Tel: 

  (86) 28-85148850, 85148041 

Fax: 

  (86) 28-85148948, 85148139 

URL: 

  http: // 

www.maipu.com

 

Email: 

 

[email protected]

 

Summary of Contents for MyPower S2300-28TC-AC

Page 1: ... Manual Maipu Communication Technology Co Ltd No 16 Jiuxing Avenue Hi tech Park Chengdu Sichuan Province People s Republic of China 610041 Tel 86 28 85148850 85148041 Fax 86 28 85148948 85148139 URL http www maipu com Email overseas maipu com ...

Page 2: ...y direct indirect incidental special exemplary or consequential damages including but not limited to procurement of substitute goods or services loss of use data or profits or business interruption however caused and on any theory of liability whether in contract strict liability or tort including negligence or otherwise arising in any way out of the use of this manual or the related content on th...

Page 3: ...e SM2300 28TC AC switch system feature description and appearance Module Introduction introduces the SM2300 28TC AC switch module Installation Preparations introduces the installation environment requirement and pre stage preparations for the SM2300 28TC AC switch System Installation introduces the device installation steps Cable Description introduces the product matching cable information Intend...

Page 4: ...ge to hardware or software An alert that calls attention to important information that if not understood or followed can result in personal injury or device damage Command conventions Convention Description Boldface Bold text represents commands and keywords that you enter literally as shown Italic Italic text represents arguments that you replace with actual values Curly brackets enclose syntax c...

Page 5: ... 1 4 Product Features 11 2 Installation Preparations 14 2 1 Security Suggestions 14 2 2 Environment Requirement 15 2 2 1 Temperature Humidity Requirement 15 2 2 2 Cleanliness Requirement 16 2 2 3 ESD Requirement 17 2 2 4 Electromagnetic Requirement 18 2 2 5 Anti lightning 18 2 3 Check Device and Accessories 19 2 4 Tools and Devices for Installation 19 3 System Installation 20 3 1 Preparation befor...

Page 6: ...nsole Port Connection 24 3 4 Protective Ground Wire Connection 24 4 Cable Description 26 4 1 Ethernet Electrical Interface Cable 26 4 2 Ethernet Optical Interface Cable 27 4 3 Console Port Cable 27 5 Troubleshooting 29 5 1 Power System Failure 29 5 2 Configuration System Failure 29 5 3 No Display on Terminal 29 5 4 Messy Code Displayed on Terminal 30 ...

Page 7: ...wer connection and check the cable length and supply the power by the length which can greatly reduce the power consumption Maipu newly launched switch not only emphasize on the green environmental and energy saving but also has excellent performance and operability This series switch adopts the new technologies such as RTCT UDLD Attack Prevention and MAC address learning restriction In addition t...

Page 8: ...nd PPPoE user physical location report 4 Perfect management and maintenance feature SNMP Telnet Cluster supporting SSH WEB VCT test physical cable 802 3ah link layer OAM Loopback port detection LLDP neighbor detection Unique real time statistics based on the Telnet port utilization traffic 1 2 Physical Features The meaning of indicator in front board of SM2300 28TC AC Switch is as in following tab...

Page 9: ...00 hours 1 3 Product Appearance 1 3 1 Front Panel of SM2300 28TC AC Front panel of SM2300 28TC AC switch has 24 10 100 1000Base T ports 4 GE Combo ports 1 Console port and 30 LED indicators FIG U RE 1 2 FR ON T P AN E L D IA G R AM O F SM2300 28TC AC SW IT C H 1 3 2 Back Panel of SM2300 28TC AC Back panel of SM2300 28TC AC switch has AC power supply hub and ground installation terminal as shown in...

Page 10: ...Indicator FIG U RE 1 4 DI AG RA M O F SM2300 28TC AC TAB LE 1 2 PO RT IN D I CAT OR IN ST RU CT ION S O F SM2300 28TC AC SW IT C H Panel Label Indicator Status Meaning 1 24 Port LINK ACT status indicator Off Port link failure On Port link success Flash Port link success send or receive data 25 28 Combo Combo port status indicator Off Port link failure On Port link success Flash Port link success s...

Page 11: ...MDI X network cable category self adaption Category 5 unshielded twisted pair UTP 100m Combo electrical port supports 10 100 1000Mbps self adaption SFP SFP SX L transceiver 1000Base SX SFP 850nm MMF 550m SFP LX L transceiver 1000Base LX SFP interface card module 1310nm SMF 10km or MMF 550m SFP LX 20 L transceiver 1310nm optical wave 9 125um single mode fiber 20km SFP LX 40 transceiver 9 125um sing...

Page 12: ...s and services are described in Table 1 5 TAB LE 1 5 PROD UCT FEA T URE S O F SM2300 28TC AC Service Realization VLAN Support 802 1Q based VLAN 4K entries Port based VLAN 4K entries Protocol based VLAN 16 entries Support GVRP GARP VLAN Registration Protocol providing auto registration of VLAN Support basic QinQ and selective QinQ MAC address table Support 16K MAC address table Support the manual a...

Page 13: ...ending and receiving control respectively particle size is 64K Mirror Support port mirror and traffic mirror QoS Support port rate limiting and traffic rate limiting Support 8 queues of different priorities per port Support SP WRR and SP WRR algorithms Support mapping to different queues by the packet VLAN PRI ACL 512 ACLs can be configured Support the traffic classification based on source MAC ad...

Page 14: ... stacking Security feature Support 802 1x authentication and support the maximum number of user limits per port Support the dynamic ARP detection Support IP Source Guard function Support AAA authentication and support Radius and TACACS multiple modes Support the IP MAC and port combination binding Support port rate limiting Support the port isolation and port security Support the packet filtering ...

Page 15: ...tall move and disassemble the switch and module with powering on to avoid human injury and device damage Do not plug unplug the switch interface module and interface card with powering on Please connect the interface cable of the switch correctly Especially do not connect the telephone wire including the ISDN wire to the serial port Pay attention to the laser safety Do not expose the eyes to the l...

Page 16: ...be satisfied 2 2 1 Temperature Humidity Requirement To guarantee the service quality and life span of the SM2300 28TC AC switch certain temperature and humidity must be maintained in the equipment room If the humidity is too high in a long term the insulating performance of insulating materials may be not good even creepage and sometimes may cause the change of mechanical performance and rustiness...

Page 17: ...ans the possible temperature and humidity when the air conditioner in a general equipment room is faulty It should be recovered to normal condition within 5h 2 2 2 Cleanliness Requirement Dust is harmful to the operation of the SM2300 28TC AC switch The dust in the room fell on the equipment may cause the electrostatics absorption which may result in poor contact of the metal connector Especially ...

Page 18: ...uit even the whole switch In the network connected by the switch electrostatic induction mainly comes from two aspects the outdoor high voltage power lines lightning and other external electric field indoor environment flooring materials the whole structure of the internal system In order to prevent electrostatic damage we should do the following Good equipment and floor ground connection Anti dus...

Page 19: ...on radar transmission station and high frequency current device Adopt necessary electromagnetic shield mode 2 2 5 Anti lightning SM2300 28TC AC makes a lot of consideration in anti lightning and necessary measures are adopted But when the lightning strength exceeds a certain tolerance it will still damage the switch to reach better anti lightning effect The user is recommended to do the following ...

Page 20: ...eed to carefully check whether the device and accessories in the package are complete according to the packing list 2 4 Tools and Devices for Installation The following lists the tools and devices required for device installation based on the product condition 1 Required tools Cross Slotted screwdriver Level ruler or tape Gloves ESD wrist strap 2 Required cable Cable in the device package 3 Requir...

Page 21: ...river level ruler or tape gloves ESD wrist strap configuration terminal such as a PC power line Console cable and RJ 45 connector network cable 3 1 2 Check Cabinet Maipu devices can be normally installed and fixed in the cabinet Before the installation reserve enough empty slot space for the device FIG U RE 3 1 HO R IZ ON T A L IN ST AL L AT I ON H O LE C EN T RA L D I ST AN C E AN D HO R I ZON T ...

Page 22: ...talled on the support board or tray in pairs of the cabinet Therefore before installing the device first install the board or tray in the cabinet as shown in Figure 3 2 Use a level to test whether the support board or tray is horizontal If the support board or tray is unstable please adjust the fixed bolt of the support board or tray to make the support board or tray horizontal and then fix it FIG...

Page 23: ...evice damage When inspecting or handling the device please wear gloves to prevent the metal part corrosion on the device by the sweat Store all packing materials for transmission when necessary 3 2 Installation Procedure Install the SM2300 28TC AC switch to the cabinet by the following steps Step 1 Wear the gloves and ESD wrist strap and ground the EDS wrist reliably Step 2 Place the device on the...

Page 24: ...ck the space between the installed devices Choose the proper cabinet blank panel standard accessory for chassis and place it at the space between devices Use the screwdriver to fix the blank panel on the chassis Installation suggestions When several devices need to be installed on the same cabinet without affecting the overall wiring and deployment it is recommended to install the heaviest device ...

Page 25: ...ct by the following steps Step1 Find a character terminal which can be a standard terminal with the RS 232 serial port or a common PC The PC is frequently used Step2 When it is confirmed that the switch or character terminal is powered off connect RS 232 serial port of the character terminal to the Console port of the switch via the Console cable When connect the Console port please check to be su...

Page 26: ...icity to safely flow into the earth and improve overall EMI feature For the external network connection such as the E1 interface PSTN and other cable series with the lightning voltage ground can provide protection Use a thick wire and connect the point with the earth it is required that the grounding resistance is less than 4 ohms If the switch is installed in the cabinet the cabinet also has to c...

Page 27: ...and 3 and 6 are rx ports TAB LE 4 1 RJ45 T HR OU G H CA B LE CAT 5 CON N EC T ION RE L AT ION S H IP RJ45 Signal Direction RJ45 Description Length 1 TX0 1 Twisted pair 1 2m 2 TX0 2 Twisted pair 2 3 RX0 3 Twisted pair 3 6 RX0 6 Twisted pair 4 4 48V 4 Twisted pair 5 5 48V 5 Twisted pair 6 7 0V 7 Twisted pair 7 8 0V 8 Twisted pair 8 TAB LE 4 2 RJ45 C RO S S C AB LE CAT 5 CON N ECT I O N RE LA T ION S...

Page 28: ... 8 0V 5 4 2 Ethernet Optical Interface Cable The Ethernet optical interface cable of the SM2300 28TC AC switch is SM or MM fiber of the LC interface 4 3 Console Port Cable The Console cable of the SM2300 28TC AC switch is a 9 core shield cable One end is the crimped RJ 45 connector which is inserted to Console port of the switch the other end is a connector with DB 9 female connector The Console c...

Page 29: ...aipu Confidential Proprietary Information Page 28 of 30 FIG U RE 4 1 DI AG RA M O F STA N DA RD DB9 IN TE R FAC E TAB LE 4 3 CO N N E CT IN G OF CON SO LE RJ45 Signal Direction DB9 Length 1 CTS 8 3m 2 DSR 6 3 RXD 2 4 GND 5 5 6 TXD 3 7 DTR 4 8 RTS 7 1 9 ...

Page 30: ...her the power line of the switch is correctly connected Check whether the power supply of switch matches with the power required 5 2 Configuration System Failure After the SM2300 28TC AC fast Ethernet switch powers on if the system works normally the booting information will be displayed on the configuration terminal if it is faulty the booting information cannot be displayed on the configuration ...

Page 31: ...erterminal parameter setting is incorrect In such case conduct the corresponding check 5 4 Messy Code Displayed on Terminal If messy codes are displayed on the configuration terminal it is likely to be the terminal such as hyperterminal parameter setting error Please check the parameter setting of the terminal such as hyperterminal The baud rate is 9600 data bit is 8 and parity check is none stop ...

Reviews: