Installing the NAS in a 29U Rack
1. ____ Open the service drawer
«A¬
, and install the mouse plate
«B¬
as shown in
Figure 1-21.
2. ____ Unpack the keyboard and the mouse, and install them on the drawer.
3. ____ Route the mouse and keyboard cables under the upper plate of the
drawer.
4. ____ If you have to install the NAS:
v
Without the earthquake feature, go to “NAS Installation into a 29U Rack
(Standard)” on page 1-18.
v
With the earthquake feature, go to “NAS Installation into a 29U Rack
(Earthquake Feature)” on page 1-19.
B
A
Figure 1-21. Keyboard Installation in 29U Rack
Installing the NAS and Its Modem
Chapter 1. Installing and Configuring the NAS and Its Modem
1-17
Summary of Contents for xSeries 300
Page 2: ......
Page 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Page 10: ...viii 2220 Setup and Service Guide ...
Page 14: ...xii 2220 Setup and Service Guide ...
Page 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Page 82: ...4 16 2220 Setup and Service Guide ...
Page 142: ...B 10 2220 Setup and Service Guide ...
Page 144: ...C 2 2220 Setup and Service Guide ...
Page 146: ...D 2 2220 Setup and Service Guide ...
Page 156: ...E 10 2220 Setup and Service Guide ...
Page 159: ......