4. At the rear of the rack, connect the display signal cable
«L¬
to the NAS
connector (see Figure 6-15).
5. Connect the display power cable to the electrical outlet.
6. Switch on the display using the power ON/OFF switch located on the front panel
(see Figure 6-9 on page 6-8).
7. Check that your display is working.
8. Go to “Leaving Procedure” on page 5-30.
L
Figure 6-15. Display Connection to the NAS
6-12
2220 Setup and Service Guide
Summary of Contents for xSeries 300
Page 2: ......
Page 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Page 10: ...viii 2220 Setup and Service Guide ...
Page 14: ...xii 2220 Setup and Service Guide ...
Page 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Page 82: ...4 16 2220 Setup and Service Guide ...
Page 142: ...B 10 2220 Setup and Service Guide ...
Page 144: ...C 2 2220 Setup and Service Guide ...
Page 146: ...D 2 2220 Setup and Service Guide ...
Page 156: ...E 10 2220 Setup and Service Guide ...
Page 159: ......