background image

Installation 

This installation guide gives step-by-step instructions about how to install the Express Plus Ethernet Switches:  
LB9019A  

Selecting a Site for the Express Plus Ethernet Switch: LB9019A 

As with any electric device, you should place the switch where it will not be subjected to extreme temperatures, humidity, 
or electromagnetic interference. Specifically, the site you select should meet the following requirements: 

The ambient temperature should be between 32 and 104 degrees Fahrenheit (0 to 40 degrees Celsius). 

-      The relative humidity should be less than 90 percent, non-condensing. 

Surrounding electrical devices should not exceed the electromagnetic field (RFC) standards for IEC 
801-3, Level 2 (3V/M) field strength. 

Make sure that the switch receives adequate ventilation. Do not block the ventilation holes on each side of 
the switch or the fan exhaust port on the rear of the switch. 

The power outlet should be within 1.8 meters of the switch. 

Connecting to Power 

Internal power:  
Step 1:  

Connect the supplied AC power cord to the receptacle on the back of the switch, and then plug it into a standard AC outlet with a 

voltage range from 100 to 260 Vac. 

Step 2:  

Turn on the switch by flipping the ON/OFF switch on the rear of the unit to 

I (ON) 

position. 

Step 

3

:  

The 

O

 position is 

OFF

 

 

 

 

Figure 1: Rear view 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CUSTOMER 
SUPPORT 
INFORMA TION 

  

 

Order toll-free in the U.S. 24 hours, 7 A.M. Monday to midnight Friday

: 877-877-BBOX

 

FREE technical support, 24 hours a day, 7 days a week: Call 

724-746-5500

 or fax 

724-

746-0746

 

Mail order:  

Black Box Corporation

, 1000 Park Drive, Lawrence, PA 15055-1018 

Web site: 

www.blackbox.com

   •   E-mail: 

[email protected]

 

 

Reviews: