6. From the rear of the rack, push the NAS against the previously installed
retainer. Install two retainers
«J¬
under the upper plate
«G¬
in order to maintain
the NAS. Secure them using screws
«H¬
.
7. At the rear of the NAS, reconnect all the cables previously removed.
J
J
J
G
H
H
Figure 5-14. Upper Plate Installation in 29U Rack
5-14
2220 Setup and Service Guide
Summary of Contents for xSeries 300
Page 2: ......
Page 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Page 10: ...viii 2220 Setup and Service Guide ...
Page 14: ...xii 2220 Setup and Service Guide ...
Page 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Page 82: ...4 16 2220 Setup and Service Guide ...
Page 142: ...B 10 2220 Setup and Service Guide ...
Page 144: ...C 2 2220 Setup and Service Guide ...
Page 146: ...D 2 2220 Setup and Service Guide ...
Page 156: ...E 10 2220 Setup and Service Guide ...
Page 159: ......