ibidi Gas Incubation System – Silver Line
5
Operation
CAUTION
– Before operating the gas mixer, the gas lines should be connected to the gas
mixer controller and regulated to 1 bar/14.5 psi of pressure.
Under no circumstances any gas line should be connected, and pressure applied during operation
of the gas mixer, as this will cause damage to the system.
After using the system, it is important to switch “off” the gas. That ensures all valve positions are
set back to “closed”.
The procedure is explained in detail in the following sections.
5.1
Installation and Connection
Figure
shows an overview of how to setup the ibidi Gas Incubation System – Silver Line together
with the ibidi Heating System Slide/Dish – Silver Line. The Gas Mixer and the Humidifying Column
should be placed next to the microscope and on the same height level as the microscope stand. The
tubing of the Heated Tubing Package needs to reach the Incubation Chamber on the microscope
stage.
ibidi
Gas Mixer
ibidi Temp
Controller
Heated Tubing Package
Electrical cable
Gas tubing
Computer (optional)
USB
cable
Temperature
Controller
cable
Bridge
cable
Incubation
Chamber
Figure 9: Connection of the components of the Gas Incubation System and the ibidi Heating System
Slide/Dish – Silver Line.
CAUTION
– Do not place the Gas Mixer and Humidifying Column on the microscope
stage! The vibration might disturb the measurement.
To operate the Gas Incubation System, perform the following steps in the indicated order:
Instruction Manual
23
Version 1.0 (June 1, 2022)