Notes
The boiler, when used in connection with a refrigeration system, must be installed
so that the chilled medium is piped in parallel with the boiler with appropriate
valves to prevent the chilled medium from entering the boiler.
The boiler piping system of a hot water boiler connected to the heating coils
located in air handling units where they may be exposed to refrigerated air
circulation must be equipped with flow control valves or other automatic means to
prevent gravity circulation of the boiler water during the cooling cycle.
Monitor the performance of system components when using the sequential load
feature of the boiler to ensure that the components are compatible. For instance,
many air handlers have a thermostat connection that will energize an internal relay
to operate the air handler circulator and its fan on a call for heat. This may result in
the air handler components operating when other loads are operating at a higher
priority, resulting in cold air blowing, or heat robbed from another load. Some
wiring alterations may be required to separate these functions from the thermostat
control in favor of more effective control from the boiler.
Closely-spaced tees
Optional
Figure 37
One-temperature space heating - tees on secondary piping
50
Section: Installation
Summary of Contents for SL 10-85 G3
Page 8: ...Intentionally left empty ...
Page 14: ...Intentionally left empty ...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Page 78: ...Intentionally left empty ...
Page 92: ...Intentionally left empty ...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Page 109: ...105 Exploded views of boiler parts ...
Page 114: ...110 Section Appendices ...
Page 122: ...Intentionally left empty ...