7.3.3 Replacing the burner on the SL 85, 115, 160 and 199 G3
boilers
Warning
The IBC heat exchanger has a small amount of combustion chamber insulation
(refractory), which contains ceramic fibers.
When exposed to extremely high temperatures, the ceramic fibers that contain
crystalline silica can be converted into cristobalite, classified as a possible human
carcinogen.
Avoid disturbing or damaging the refractory. If damage occurs, contact the factory for
directions.
Avoid breathing and contact with skin and eyes and follow these precautions:
1. For conditions of frequent use or heavy exposure, respirator protection is
required. Refer to the “NIOSH Guide to the Selection and Use of Particulate
Respirators Certified under 42 CFR 84” for selection and use of respirators
certified by NIOSH.
For the most current information, NIOSH can be contacted at 1-800-356-4676 or
on the web at www.cdc.gov/niosh.
2. Wear long sleeved, loose fitting clothing, gloves and eyes protection.
3. Assure adequate ventilation.
4. Wash with soap and water after contact.
5. Wash potentially contaminated clothes separately from other laundry and rinse
washing machine thoroughly.
6. Discard used insulation in an air tight plastic bag.
NIOSH stated first aid:
Eye contact - Irrigate and wash immediately.
Breathing - Provide fresh air.
For reference, see
Removing the burner
1. Turn off the electric power and gas supply to the boiler.
2. Ensure that the boiler cools down to the surrounding temperature. Do not drain the boiler
unless freezing conditions are expected during this procedure.
84
Section: Service and maintenance
Summary of Contents for SL 10-85 G3
Page 8: ...Intentionally left empty ...
Page 14: ...Intentionally left empty ...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Page 78: ...Intentionally left empty ...
Page 92: ...Intentionally left empty ...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Page 109: ...105 Exploded views of boiler parts ...
Page 114: ...110 Section Appendices ...
Page 122: ...Intentionally left empty ...