from any portion of the building and a minimum of 2 feet (61 cm) above the roof line
plus the anticipated snow line.
3.7.6 Sidewall vent termination
Caution
Vent termination clearances in this section are code minimum, or IBC-recommended
minimum requirements, and may be inadequate for your installation. Building envelope
details must be examined carefully. Take action to avoid moisture entering building
structures. Serious structural damage may occur if adequate precautions and
clearances are not considered. These precautions apply to neighboring structures as
well as to the structure the boiler(s) are installed in.
Vent terminal
Air supply inlet
Area where terminal is not permitted
Figure 19
Minimum clearances from vent/air inlet terminations (see legend on adjacent page)
29
3.7.6 Sidewall vent termination
Summary of Contents for SL 10-85 G3
Page 8: ...Intentionally left empty ...
Page 14: ...Intentionally left empty ...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Page 78: ...Intentionally left empty ...
Page 92: ...Intentionally left empty ...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Page 109: ...105 Exploded views of boiler parts ...
Page 114: ...110 Section Appendices ...
Page 122: ...Intentionally left empty ...