1.
Attach the support bracket (supplied) to the
wall studs using the supplied
¼" x 2½"
long lag screws (min. 4) with ¼" flat
washers.
2.
Hook the boiler tab (located on
back of boiler) over the support
bracket flange.
3.
Ensure that the boiler tab is flush against the
mounting bracket flange.
4.
Secure the lower part of the boiler
to the wall with two field-supplied
¼" bolts.
3.5 Connecting the vent and air intake pipes
These appliances offer 3" connections that accept standard 3" PVC/CPVC pipe (3.5" OD) and 3"
nominal PPs (80 mm) pipe. Use standard vent pipe fittings to adapt to smaller diameter pipe if
appropriate . Venting must be supported in accordance with the applicable code and instructions
supplied by the manufacturers.
18
Section: Installation
Summary of Contents for SL 10-85 G3
Page 8: ...Intentionally left empty ...
Page 14: ...Intentionally left empty ...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Page 78: ...Intentionally left empty ...
Page 92: ...Intentionally left empty ...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Page 109: ...105 Exploded views of boiler parts ...
Page 114: ...110 Section Appendices ...
Page 122: ...Intentionally left empty ...