Closely-spaced tees: To avoid induced flow, each set of tees should be installed with
straight piping a minimum of 8 pipe diameters upstream and 4 pipe diameters
downstream, with no elbow or other component that may create turbulent flow. Tees
should be as close together as possible (maximum four pipe diameters apart) and there
should be no restrictions between the fittings that would result in a pressure drop.
Heat Migration: On secondary loops that extend vertically to a load that is above the
primary loop, use check valves on both supply and return of secondary piping.
Check valves or zone valves on return.
Figure 36
Primary-secondary piping details with closely-spaced tees
49
3.11.2 System piping
Summary of Contents for SL 10-85 G3
Page 8: ...Intentionally left empty ...
Page 14: ...Intentionally left empty ...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Page 78: ...Intentionally left empty ...
Page 92: ...Intentionally left empty ...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Page 109: ...105 Exploded views of boiler parts ...
Page 114: ...110 Section Appendices ...
Page 122: ...Intentionally left empty ...