![IBC SL 10-85 G3 Installation & Operating Manual Download Page 58](http://html1.mh-extra.com/html/ibc/sl-10-85-g3/sl-10-85-g3_installation-and-operating-manual_605137058.webp)
Air handler
Domestic water, hot and cold: A thermostatic tempering valve may be required by
local code.
Indirect hot water tank
Figure 44
Two pump, two load parallel piping concept
3.11.2.3 Multiple-boiler piping
Multiple IBC boilers can be installed in a single heating system to provide redundancy,
increased output, and greater heating plant turn-down capabilities. Primary-secondary piping
must be employed, and each boiler must be installed with its own pump as illustrated below.
This approach provides constant head and flow at each boiler, regardless of flow variations in
the main building loop.
54
Section: Installation
Summary of Contents for SL 10-85 G3
Page 8: ...Intentionally left empty ...
Page 14: ...Intentionally left empty ...
Page 66: ...Figure 49 Electric wiring connections 62 Section Installation ...
Page 78: ...Intentionally left empty ...
Page 92: ...Intentionally left empty ...
Page 106: ...Internal wiring diagram Figure 53 Internal wiring diagram 102 Section Appendices ...
Page 107: ...Sequence of Operation Figure 54 Sequence of Operation 103 Sequence of Operation ...
Page 109: ...105 Exploded views of boiler parts ...
Page 114: ...110 Section Appendices ...
Page 122: ...Intentionally left empty ...