
8.6 How to replace components
8-26
8. Maintenan
ce and Inspection
(12) Attach belt retainer 1, rolled bush, fixing belt and belt retainer 2 to long belt and hold
them with screws.
(Note) Make sure long belt and fixing belt are aligned with each other.
(Note) Insert rolled bush to fixing belt.
(13) Affix idler pulley assembly with screws temporarily. (Keep the screws loose)
Idler pulley assembly
Flanged hex socket set screw
(
B6/B7:
M4 × 12
)
Belt retainer 1
Hex socket head cap screws × 2 pcs
(B6/B7:M3 × 10,
Tightening torque 1.54N•m)
Rolled bush
Fixing belt
Long belt
Belt retainer 2
Summary of Contents for EYECYLINDER EC-B6 Series
Page 2: ......
Page 10: ......
Page 28: ...Intro 18 ...
Page 30: ......
Page 50: ...1 20 1 Specifications ...
Page 52: ......
Page 64: ......
Page 84: ......
Page 102: ......
Page 108: ...5 6 5 Preventive Predictive Maintenance ...
Page 110: ......
Page 124: ...6 14 6 Parameters ...
Page 126: ......
Page 144: ...7 18 7 Troubleshooting ...
Page 146: ......
Page 184: ......
Page 188: ......
Page 192: ...10 4 10 Life ...
Page 194: ......
Page 197: ...Appendix 12 1 Index 12 1 12 2 Revision history 12 4 ELECYLINDER Chapter12 ...
Page 198: ......
Page 203: ......